Design is immediately associated with construction, and indeed it is, in the construction of residential and industrial facilities, design is one of the main areas, although this term is also used for other definitions.
Preparation, as well as the development of documentation related to construction work, and there is the design of structures. The more complex the designed object, the more stages of design execution. The most complex projects of factories, industrial complexes, industrial parks, civil and residential buildings involve several stages of design.
The design process is complex and time-consuming, and for many years of work he lived an industrial project carried out complex design of factories, warehouses of metal products, factories, civil, residential and agricultural facilities, production workshops, treatment facilities, etc. This process includes technical and economic calculations, as well as drawing up diagrams, schedules, estimates, layouts and approval documents. Using them will create the required ready-made object.
Documentation
Working documentation is the most important part of the construction of any facility. It contains absolutely all general construction works, engineering systems of the building, which also include low-current networks and electrical networks. Also, the documentation indicates information about video surveillance.
Finished project
The result is a finished project. It can be both typical and individual. A finished project is a package of documents that are drawn up in the right, specific order. Any part of the project undergoes a thorough examination, and also goes through several stages of approval. This is done in order to avoid inaccuracies, any violations. After all, this is the main stage on which all construction depends.
The finished project provides for any detail, regulates the construction process itself in engineering and material terms, and these are estimates, documents on the organization of labor, which are carried out by the builders.
The term of its implementation depends on how high the complexity of the structure is, whether it is a typical or individual project.