A very important factor in the construction of any facility is safety. Here you need to strictly observe all the standards and rules, and if a tower crane is also working at a construction site, then it is necessary to ensure its competent operation. For this, the foundation of the tower crane is created, which ensures the stability of the equipment. Regardless of whether it is in work, or temporarily not used. In general, one cannot do without a project for the foundation of a tower crane.
The development of such projects is impossible without certain experience, technical knowledge in mechanics and construction work. The foundation project must comply with all regulations, rules and state standards in force on the territory of the Russian Federation. It is based on ensuring the safety of people involved in the operation of the equipment. Therefore, it is recommended to apply for the preparation of the project only to competent, professional specialists who are actively involved in the design of project documentation and have extensive experience in this, in more detail at https://www.gk-smp.ru/proektirovanie/fundament-bashennogo-krana.html .
Project Development Process
Before starting the development of the project, the specialist needs to study the working model of the crane according to the technical documentation. Be sure to read the report on geotechnical research at the construction site. It is also important to analyze the construction site plan. The designer also coordinates the issue of binding the foundation slab with the developer.
In modern construction, there are several methods for installing tower cranes. They are mounted on: anchors, support structures, rail tracks. For each of these methods, projects are developed taking into account all the nuances of the installation.
The finished project is handed over to the customer. It describes in detail the quantity and characteristics of the materials that must be used to lay the foundation. In essence, the project for the foundation of a tower crane is a hard copy, consisting of a capital part with calculations and a description of the process of arranging the foundation. The general package of documents includes drawings, diagrams and other project documentation.