In December 2019, PJSC DNEPROSPETSSTAL delivered 18,888 tons of steel, which is 6.2% higher than the level of the previous month. During the same period, the Company produced 13,216 tons of rolled metal, which is 3.5% more than in November 2019.
The total cost of marketable products manufactured in December 2019 amounted to UAH 567,402 thousand. (at current prices).
In December 2019, it should be noted the overfulfillment of the plan for shipment to the processing shops: rolling, forging, calibration shops, KPTs and TsAOM.
Dneprospetsstal increased steel delivery in December
|
Azovpromstal® 15 January 2020 г. 12:13 |